Real-time CCTV threat analytics
AI Sentinel
A multi-camera video analytics platform that watches live feeds and raises instant operator alarms for persons, weapons, groups, loitering, no-go zone breaches, and people or vehicles approaching a perimeter fence.
- Processes up to 10 simultaneous RTSP feeds on a single RTX 4090 server
- Pipeline being re-engineered to run 20–30 cameras on 8 GB GPUs with higher accuracy
- Turned security-force requirements (armed-individual alerts, uniformed vs non-uniformed, 4–5 person groups) into a product spec and shipped it
- Operator dashboard with zone drawing, event timeline and alarm acknowledgement
Python · YOLO · OpenCV · RTSP · CUDA · React